JTEG Joint Collaboration Initiative (JCI)
General Data Structure for Projects
- Project Number(JTEG assigned):
- Expected Entry: Submitting Activity (SA) – FY – Sequence Number
- Examples: NS-09-0001, NP-09-0101, AF-10-1234, etc.
- SA Codes: AF=Air Force. AR=Army, MC=Marine Corps, NA=NAVAIR, NS=NAVSEA, DL=DLA, CG=Coast Guard, NP=NASA
- 2. Project Title:
- Expected Entry: Narrative
- Examples: N/A
- 3. Service:
- Expected Entry: One option from a list.
- Options: Air Force, Army, Marine Corps, Navy, DLA, and Coast Guard
- 4. Command:
- Expected Entry: Narrative (spell out)
- Examples: NAVAIR, AFMC, TACOM, etc.
- Implementation Depot:
- Expected Entry: One option from a list (primary if more than one)
- Examples: ANAD,CCAD, LEAD, RRAD, TYAD, CHYPT, JAX, NORIS, NNSY, PHNSY&IMF, PNSY, PSNSY&IMF, NSWC CRANE, NUWC KEYPORT, OCALC, OOALC, WRALC, ALBANY, BARSTOW
- 6. Project Lead:
- Expected Entry: Narrative – defined (Name, e-mail, phone number and organization)
- Examples: Joe Logistics, Joe@xxx.mil, (555) 555-1234, WR-ALC/ABCD
- TI Goals Supported:
- Expected Entry: List of the three goals supported in rank order
- Examples: C – 1, S – 2, P – 3; C – 2, S – 3, P – 1 and C – 3, S – 1, P – 2.
- Goals: C = Cost, S = Schedule, P = Performance
- Rank Order: 1 = highest rank, 3 = lowest rank
- 8. Requirements Area:
- Expected Entry: One option from a list.
- Examples: 1) Manufacturing, 2) Metal Working, 3) Electronics Repair (systems), 4) Coatings/Corrosion Control, 5) Metrology, 6) Inspection/Test, 7) Environmental, 8) Work Load/Work Force/Material Management, 9) Electrics/Electrical (power), 10) Composites and NMM (Non-metal materials), 11) Infrastructure, 12) Maint-enance Prep/Re-assembly
- 9. Platform General:
- Expected Entry: One option from a list
- Examples: Aircraft, ship, ground vehicle (track or wheel) and other
- Platform Specific:
- Expected Entry: Narrative
- Examples: F-16, HMMWV, radar, UAV, submarine, etc.
- 11. Implemented Technology:
- Expected Entry: Narrative (3 words maximum)
- Examples: Robotics, friction stir welding, laser, rapid prototyping, new materials, sensor, automated identification technology (AIT), etc.
- 12. Problem Definition:
- Expected Entry: Narrative
- Examples: N/A
- 13. Proposed Solution:
- Expected Entry: Narrative – detailed
- Examples: N/A
- 14. Expected Result:
- Expected Entry: Narrative – specify deliverable
- Examples: N/A
- 15. Benefits:
- Expected Entry: Narrative
- Examples: N/A
- 16. Unfunded Requirement (UFR):
- Expected Entry: Yes or No
- Examples: N/A
- 17. Start FY (Fiscal Year):
- Expected Entry: One option from a list
- Examples: FY12, FY13, FY14, FY15, FY16
- 18. Completion Date:
- Expected Entry: Actual or estimated completion date (ECD) in month/year format
- Examples: Oct-12, Mar-13, etc.
- 19. Work in Progress (WIP):
- Expected Entry: Yes or No
- Examples: N/A
- 20. Implemented:
- Expected Entry: Yes or No
- Examples: N/A
- 21. Comments:
- Expected Entry: Narrative (link to website if applicable – i.e. MANTECH, SBIR, CTMA, etc.)
- N/A
