Manufacturing |
||
Project No. | Project Title | Service |
MC-07-0001 | Backshop Project | Marine Corps |
MC-06-0001 | Reverse Engineering & Prototyping | Marine Corps |
MC-06-0002 | Damage and Wear Assessment Using Condition Based Monitoring | Marine Corps |
MC-05-0003 | Friction Stir Welding | Marine Corps |
NA-09-0002 | Volumetric Accuracy for Large Machine Tools | NAVAIR |
Metal Working |
||
Project No. | Project Title | Service |
MC-07-0002 | Cold Spray/Kinetic Processing | Marine Corps |
MC-07-0004 | Titanium Welding | Marine Corps |
AR-07-0001 | Modernization of Nickel Electroplating at Depots | Army |
NA-09-0008 | Low Plasticity Burnishing | NAVAIR |
NA-09-0007 | SPEC-EDM drill | NAVAIR |
NS-09-0002 | VIRGINIA Class Submarine (VCS) SHAFT REPAIR | NAVSEA |
AF-10-0004 | Development of High Strength Stainless Steel | Air Force |
Electronics |
||
Project No. | Project Title | Service |
NA-10-0001 | JSF Radar Depot Rework Capability | NAVAIR |
NA-10-0003 | CASS Lab Improvements | NAVAIR |
NA-09-0004 | Composite Radome Electrical Testing | NAVAIR |
NA-11-0001 | LM-STAR | NAVAIR |
NA-11-0002 | CCTARS RF depot rework capability | NAVAIR |
Coatings/Corrosion Control |
||
Project No. | Project Title | Service |
MC-08-0001 | Spray Technique and Analysis Research for Defense (STAR4D) | Marine Corps |
MC-08-0002 | Anodizing of Aluminum Parts for Small Arms | Marine Corps |
MC-09-0002 | Robotic Painting | Marine Corps |
NA-09-0010 | Automated Aircraft Sanding Systems | NAVAIR |
NA-09-0009 | P-3 Wash Interval Study | NAVAIR |
NA-10-0002 | Atmosheric Plasma (AP) Unit | NAVAIR |
NA-08-0002 | GPX Bio media paint strip type VII report | NAVAIR |
NA-09-0003 | Cold Spray Magnesium repair | NAVAIR |
NS-10-0003 | Corn Hybrid Polymer (CHP) Blast Media for the Removal ofCoatings from Delicate Substrates | NAVSEA |
NS-07-0001 | Submarine Vertical Launch System (VLS) Laser Cladding RepairProject | NAVSEA |
NS-08-0001 | Induction Heat for Coatings Removal | NAVSEA |
NS-09-0003 | In Situ / Field Repair; Man-portable Weld Clad Tools for ShipboardValve Repair | NAVSEA |
NS-09-0001 | Naval Application of Laser Ablation Paint Removal Technology | NAVSEA |
NS-09-0005 | Universal Surface Inspection Tool | NAVSEA |
AF-10-0002 | HVOF Coating Removal for Land Gear | Air Force |
Inspection/Test |
||
Project No. | Project Title | Service |
MC-09-0003 | Automated Process & Inspection Guide (AP&IG) | Marine Corps |
MC-07-0003 | Digital Radiography | Marine Corps |
NA-09-0001 | Predictive and Performance Maintenance Systems Ch-53 | NAVAIR |
NS-09-0004 | Alternative Process/Technology for Radiographic Testing (RT) ofPipe Welds | NAVSEA |
AF-12-0001 | NDI Multilayered Structures | Air Force |
AF-08-0001 | NDI Improvement Project | Air Force |
AF-09-0001 | High Velocity Oxygen Fuel Internal Diameter Gun | Air Force |
AF-12-0002 | NDI of Honeycomb Bonded Structure | Air Force |
Environmental |
||
Project No. | Project Title | Service |
MC-08-0005 | Regenerative Dynamometer Operation | Marine Corps |
MC-09-0001 | Main Crane Way Sustainability | Marine Corps |
MC-09-0006 | Renewable Energy | Marine Corps |
MC-08-0004 | Hexavalent Chromium Reductions in Welding Fume Emissions | Marine Corps |
MC-08-0003 | Hexavalent Chromium Reductions in Aluminum PretreatmentOperations | Marine Corps |
NS-10-0001 | ALTERNATIVE CUTTING METHODS TO REDUCE METAL FUME EMISSIONS AND CONTAMINATE DEPOSITION | NAVSEA |
NS-10-0002 | HAZMAT Analyzers for Rapid On-Site Analysis | NAVSEA |
AF-12-0001 | Plasma Resources Recovery System | Air Force |
AF-10-0001 | Parent Material Restoration “Recast“ | Air Force |
Work Load/Work Force/Material Management |
||
Project No. | Project Title | Service |
MC-05-0001 | Forward Area Repair and Maintenance (FARM) Concept | Marine Corps |
MC-06-0004 | TM 2350-45 Rewrite | Marine Corps |
MC-09-0004 | Centralized Fleet Automated Management System (CFAMs) | Marine Corps |
AR-09-0001 | Logistics Site Planning and Operations Tool – LOGSPOT | Army |
AR-07-0002 | Sense and Respond Logistics Development of Comprehensive Secondary Repairable Legacy Platform Readiness Capability (LAV III) | Army |
AR-08-0002 | Centralized Fleet Automated Management System (CFAMS) | Army |
AR-08-0001 | ATLAS: A Generalized Maintenance Modeling and Simulation ToolSuite | Army |
Electrics, Electrical |
||
Project No. | Project Title | Service |
AF-12-0003 | Enhanced Mx Planning | Air Force |
Composites and NMM (Non-metal materials) |
||
Project No. | Project Title | Service |
MC-05-0002 | Manufacturing and Repair of Composite Components | Marine Corps |
NA-09-0006 | Implementation of Pre-Cure Composite Laminates | NAVAIR |
NA-09-0005 | Composite Repair Study FRCSE | NAVAIR |
NA-08-0001 | Automated Rotor Blade Stripping System | NAVAIR |
Metrology |
||
Project No. | Project Title | Service |
Maintenance Prep/ Assembly Preservation |
||
Project No. | Project Title | Service |
Infrastructure |
||
Project No. | Project Title | Service |